Exchange Liquidation Price Calculator (KuCoin, OKX, Bitget, Gate)
Pick your exchange and see where a USDT-margined futures position is liquidated, with the formula that exchange publishes: isolated margin on KuCoin, OKX, Bitget and Gate, and cross margin on KuCoin, Bitget and Gate.
- Liquidation price · in your price currency
- –
- Distance from the price you entered
- –
- Position size (coins)
- –
- Position value · in your price currency
- –
- Margin used in the formula · in your price currency
- –
- Account margin rate (AMR, cross)
- –
Assumptions
- USDT-margined contracts on the exchange you pick, with its formula and the maintenance rate and fee rate you enter.
- Isolated: the position margin is opening value ÷ leverage unless you type the margin.
- Cross: one-way mode, at the mark price you enter, with other cross positions entered as their total mark value.
- In cross margin KuCoin liquidates on the risk ratio, so the cross price is a reference.
- OKX: isolated only. Bitget: classic account, cross in one-way mode with no open orders. Gate: one-way mode, cross margin as Gate defines it.
Estimate Checked KuCoin Help Center: Liquidation and Liquidation Price (isolated and cross formulas; its 29,535.9 and ETHUSDT 4,610.7 examples are tests here) All sources
How it is calculated
- KuCoin isolated: liquidation = (opening value − side × position margin) ÷ [coins × (1 − side × (MMR + fee))], side = 1 long, −1 short
- Coins = contracts × multiplier; opening value = coins × entry; position margin = opening value ÷ leverage (or the margin you type)
- KuCoin cross: liquidation = (MV − |MV| × AMR) ÷ (1 − side × MMR − side × taker fee) ÷ (side × coins)
- MV = side × coins × mark price; AMR = total cross margin ÷ (|MV| + mark value of your other cross positions)
- OKX isolated: long = (M − N × V × P) ÷ [N × V × (MMR + fee − 1)]; short = (M + N × V × P) ÷ [N × V × (MMR + fee + 1)], M = margin balance, N = contracts, V = face value, P = average open price
- Bitget isolated (classic account): liquidation = [position margin + offset − size × average entry × side] ÷ [size × (MMR + taker fee − side)], size in coins
- Bitget cross (classic account, one-way, no open orders): the same, with X in place of the position margin; X = total asset balance + unrealised PnL of other cross positions − their maintenance margin
- Gate isolated and cross: liquidation = (average entry − side × margin ÷ multiplier ÷ contracts) ÷ [1 − side × (MMR + taker fee)]
Worked example (KuCoin)
KuCoin's own example, with KuCoin's formula: 1,000 BTCUSDT contracts (1 BTC) long at 30,000, 50×, maintenance margin rate 0.4%, fee 0.06%. OKX and Bitget publish no complete worked example.
| You enter | |
|---|---|
| Exchange | KuCoin |
| Contract preset (optional) | None: I type my own values |
| Margin mode | Isolated |
| Direction | Long |
| Contracts | 1,000 |
| Contract multiplier | 0.001 |
| Average entry price | 30,000 |
| Leverage | 50 × |
| Maintenance margin rate | 0.4 % |
| Liquidation fee rate | 0.06 % |
| You get | |
| Liquidation price | 29,535.86498 |
| Distance from the price you entered | 1.55% |
| Position size (coins) | 1 |
| Position value | 30,000 |
| Margin used in the formula | 600 |
| Account margin rate (AMR, cross) | – |
On KuCoin, isolated margin, this long is liquidated if the mark price falls about 1.55% to 29,535.86498. Keep your stop-loss well before that.
Worked example (Gate)
Gate's own example, with Gate's formula: 131 BTC_USDT contracts (multiplier 0.0001) long at 60,415, position margin 79.73722738 USDT, maintenance margin rate 0.4%, taker fee 0.075%. Gate shows 54,587.4.
| You enter | |
|---|---|
| Exchange | Gate |
| Contract preset (optional) | None: I type my own values |
| Margin mode | Isolated |
| Direction | Long |
| Contracts | 131 |
| Contract multiplier | 0.0001 |
| Average entry price | 60,415 |
| Leverage | 10 × |
| Position margin (optional) | 79.73722738 |
| Maintenance margin rate | 0.4 % |
| Taker fee rate | 0.075 % |
| You get | |
| Liquidation price | 54,587.47928 |
| Distance from the price you entered | 9.65% |
| Position size (coins) | 0.0131 |
| Position value | 791.4365 |
| Margin used in the formula | 79.7372 |
| Account margin rate (AMR, cross) | – |
On Gate, isolated margin, this long is liquidated if the mark price falls about 9.65% to 54,587.47928. Keep your stop-loss well before that.
Questions
Why does the cross liquidation price move when my other positions move?
In cross margin all positions share one pool of margin. KuCoin spreads it over every position by mark value (the AMR), so a change in any position, or in your total margin, moves every liquidation price.
KuCoin's cross example says 47,956 for BTCUSDT. Why does this tool give 48,243?
With the inputs in KuCoin's own example, its printed formula gives about 48,243; the 47,956 on the page does not follow from it. Its ETHUSDT figure, 4,610.7, does, and is a test here.
Where is coin-margined (inverse) KuCoin?
Use the Coin-Margined Futures Calculator, which already uses KuCoin's fee term for inverse contracts.
Why do the exchanges give the same price for the same inputs?
Their published isolated formulas are the same algebra (Bitget adds its offset). What differs is what you type: each exchange's own maintenance rate tiers, its fee rate (KuCoin a liquidation fee rate, OKX, Bitget and Gate your taker fee) and its contract size.
Which maintenance margin rate should I type?
The rate of the tier your position value falls in, from your exchange's tier table for that contract. The Bitget and Gate presets fill tier 1, which covers positions up to 200,000 USDT on Bitget and up to 500,000 (BTC) or 300,000 USDT (ETH) on Gate as listed on 5 Nov 2026; above that, type the rate of your tier. Gate works out the maintenance margin tier by tier, so above tier 1 this tool's price is a little closer to your entry than Gate's.
What is Bitget's pre-calculated offset?
A term in Bitget's isolated and cross formulas that its Liquidation Mechanism page calls the maintenance margin deduction. Bitget does not publish a table of it, so type the figure if you have it, or 0. A larger offset moves the liquidation price further from your entry.
What is not covered yet?
Each new exchange is added only after its own documentation and examples have been read and tested. Not covered yet: OKX cross margin, Bitget cross with open orders, hedge mode, coin-margined contracts, and Bitget's unified trading account formula.
Sources and checks
- KuCoin Help Center: Liquidation and Liquidation Price (isolated and cross formulas; its 29,535.9 and ETHUSDT 4,610.7 examples are tests here) · updated by the authority to 5 January 2026
- KuCoin Help Center: Liquidation Price in Cross Margin Mode (AMR and mark value; reference price only) · updated by the authority to 6 January 2026
- OKX Help: Introduction to the isolated mode of Futures mode/Multi-currency/Portfolio margin (OKX isolated futures formulas) · updated by the authority to 30 September 2026
- OKX Help: How do I calculate the liquidation price for futures? (its 51,226.5 BTCUSDT figure is a consistency test here) · updated by the authority to 11 August 2026
- Bitget Support: What Is Estimated Liquidation Price in Bitget Futures? (isolated formula with the pre-calculated offset) · updated by the authority to 18 September 2025
- Bitget Support: Liquidation Mechanism (same isolated formula; the offset as maintenance margin deduction) · updated by the authority to 22 September 2026
- Gate Help Center: Estimated Liquidation Price and Bankruptcy Price Calculations (its isolated 54,587.4 and cross 112.64 examples are tests here) · updated by the authority to 29 August 2022
- Gate Help Center: What is Maintenance Margin (maintenance margin worked out tier by tier) · updated by the authority to 23 July 2024
- Bitget API: Get Position Tier (mmr = maintenance margin ratio)
- Bitget public API: BTCUSDT position tiers (tier 1, 0 to 200,000 USDT, mmr 0.004, read 5 Nov 2026)
- Bitget public API: ETHUSDT position tiers (tier 1, 0 to 200,000 USDT, mmr 0.004, read 5 Nov 2026)
- Bitget public API: USDT-M contract config (takerFeeRate 0.0006 for BTCUSDT and ETHUSDT, read 5 Nov 2026)
- Gate API v4 futures documentation (quanto_multiplier = coins per contract, maintenance_rate = tier-1 rate, taker_fee_rate)
- Gate public API: BTC_USDT contract (quanto_multiplier 0.0001, maintenance_rate 0.003, taker_fee_rate 0.00075, read 5 Nov 2026)
- Gate public API: BTC_USDT risk limit tiers (tier 1 up to 500,000 USDT at 0.3%, read 5 Nov 2026)
- Gate public API: ETH_USDT contract (quanto_multiplier 0.01, maintenance_rate 0.003, taker_fee_rate 0.00075, read 5 Nov 2026)
- Gate public API: ETH_USDT risk limit tiers (tier 1 up to 300,000 USDT at 0.3%, read 5 Nov 2026)
Last checked: 5 November 2026. This tool passes 38 automatic tests before every release. How we check our tools
Your numbers never leave your device: the calculation runs in your browser and nothing you type is sent or stored.
An estimate with the exchange's published formula. OKX, KuCoin, Bitget and Gate liquidate on the mark price and reduce a large position tier by tier before closing it. KuCoin liquidates cross positions when the risk ratio reaches 100%, so the cross price is a reference only. The price your exchange shows is the one that counts. This is not financial advice. Results are estimates for information only and are not financial, investment, tax or legal advice. Crypto prices move fast and leveraged trading can lose more than you expect. Check figures on your exchange or wallet before you act.